Shires Topaz Lead Rope
Shires Topaz Lead Rope
  • Load image into Gallery viewer, Shires Topaz Lead Rope
  • Load image into Gallery viewer, Shires Topaz Lead Rope

Shires Topaz Lead Rope

Regular price
$19.95 CAD
Sale price
$19.95 CAD
Regular price
Sold out
Unit price
per 
Shipping calculated at checkout.

Zesty coloured comfort hold lead ropes to match the Topaz nylon headcollars with brass colored swivel trigger clips. Length: 71" / 6'

Comes in Black, Dark Green, Green, Grey, Light Blue, Navy, Orange, Pink, Purple, Raspberry, Red, Yellow, Navy/Red/Turquoise, Orange/Navy/Turquoise, Purple/Lime Green/Pink, and Pink/Navy/Turquoise.